2026 London homeowner guide
Legal Basement Requirements in London, Ontario
A legal basement is not defined by one window measurement or one layer of drywall. It is the result of a permit-first process that coordinates zoning, drawings, structure, fire safety, egress, mechanical work, inspections and rental licensing.
Last reviewed: July 21, 2026. Based on the City of London's ARU and building-permit guidance and Ontario's second-unit guidance. Requirements can change and every property is different.
The short answer
To legalize a basement apartment in London, confirm zoning, obtain an approved building permit before construction, complete the OBC and Fire Code work shown on the permit drawings, pass inspections, close the permit, and obtain the required residential rental unit licence before operating it as a rental.
The eight-part legalization path
1. Property and zoning
Confirm the property type, zone and project fit. London currently permits up to four total dwelling units where the underlying residential use is permitted, subject to current ARU restrictions and property-specific review.
2. Permit strategy
A basement apartment and work such as a new below-grade entrance, increased headroom, interior alterations, HVAC changes and enlarged openings require permit review. Do not start demolition or structural work first.
3. Complete drawings
Plan sets should document existing floors and proposed walls, doors, windows, rooms, plumbing, ceiling heights, exits, egress and fire separations. London says single-line drawings are not acceptable.
4. Ceiling and structure
Ontario guidance uses 1.95 m over the required basement second-unit floor area and route to the exit as a common benchmark. Low areas may require redesign, selective excavation, bench footing or underpinning.
5. Exits and egress
The correct path depends on unit layout and the applicable Code route. Measure the clear openable window—not the frame—with the Ontario egress calculator, then have the designer confirm the full exit strategy.
6. Fire and life safety
Fire separations must work as continuous assemblies around ducts, services, doors and common spaces. Smoke and carbon-monoxide alarms, closures and penetrations must match the approved design. Read the fire separation guide.
7. Mechanical and electrical
Heating, ventilation, plumbing and electrical changes must be coordinated with the architectural plans and completed under the required permits and inspections. London may require a qualified BCIN HVAC designer.
8. Inspections and licensing
Book inspections at the stages listed on the permit, correct deficiencies, close the building permit and maintain the City's residential rental unit licence if the unit is rented.
Interactive basement legalization readiness check
Check only items you can prove with a document, measurement or professional review. This is planning triage—not permit approval.
0 of 8 proof items ready
What to bring to a first professional review
- Property address, survey or site plan, and any old permit records.
- Photos and measured sketches of every floor—not only the basement.
- Clear ceiling heights under finished surfaces, beams and ducts.
- Window clear-opening dimensions, well depth and sill heights.
- Known plumbing, HVAC, electrical-panel and foundation constraints.
- Your intended use: family unit, long-term rental, existing occupied unit or enforcement response.
Get a plain-English readiness review
Tell us the main obstacle and we will route your request to the most relevant next-step guide or vetted London professional. No public phone CTA and no obligation.
Primary sources
- City of London: Additional Residential Units (last modified June 5, 2026)
- City of London: Before you apply for a building permit
- Ontario: Add a second unit in your house
- Ontario Building Code, O. Reg. 332/12
Educational information only. The approved permit drawings and the authorities having jurisdiction determine the requirements for a specific property.